A new outdoor tennis court is reported at $60,000 to $120,000, and the base you choose decides both ends of that. This guide explains the asphalt and concrete decision, the space a court really needs, and what ownership costs after the build.

How much does a tennis court cost?

Published industry sources put a new outdoor court at $60,000 to $120,000, with asphalt builds averaging around $65,000 and post-tensioned concrete around $85,000. The base is the decision that moves the number most, and it is also the one you cannot revisit later without rebuilding.

Reported by published industry sources, August 2026

One outdoor court, new build
$60,000 to $120,000
The base specification accounts for most of the spread. Cushioned surfacing, fencing and lighting move a project toward the top.
Asphalt base
around $65,000 typical
Reported at $5 to $8 per square foot for the base. Lower up front, and the surface that cracks first.
Post-tensioned concrete base
around $85,000 typical
Reported at $12 to $18 per square foot. More up front, and the reason a court can last decades without structural repair.
Resurfacing, every four to eight years
$4,000 to $10,800
Reported at $1.50 to $4 per square foot installed, with preparation adding $500 to $3,000.

A range is a planning tool rather than a quote. Site conditions, access and local labour move these numbers more than anything else on this page, and only a contractor who has seen your site can tell you what your own project costs.

What moves the number

The base: asphalt or post-tensioned concrete, the decision that outlives the surface
Surfacing, and whether it is cushioned
Resurfacing and crack repair, every four to eight years for the life of the court
Lighting, if the court will be used after dark
A tennis court drawn to its published dimensions. Most sites need room around the lines as well as inside them.

Will it fit

The playing surface is only part of the answer. Run-off, access for equipment and where the water goes decide as much as the dimensions do.

Common questions

How much space does a tennis court need?

A court is 78 by 36 feet, but a standard build occupies 60 by 120 feet, about 7,200 square feet, once run-off is included. The run-off is not optional: it is the room a player uses to reach a wide ball, and a court built without it plays badly however good the surface is.

Asphalt or concrete for a tennis court?

Post-tensioned concrete costs more up front and is the better long-term answer for most sites, because it resists the cracking that eventually forces structural repair on an asphalt court. Asphalt is the cheaper build and remains reasonable where budget is the binding constraint and the ground is stable.

How often does a tennis court need resurfacing?

Every four to eight years for a hard court, at a reported $4,000 to $10,800. Resurfacing restores colour, texture and playability; it does not fix a base that is moving, which is why the base decision at build time is the one that governs long-term cost.

Can I add pickleball lines to my tennis court?

Yes, and it is reported at $800 to $3,500 against $20,000 or more for a dedicated court. A standard tennis court has room for up to four pickleball courts laid perpendicular to the tennis baselines, or a blended layout of one tennis court plus two pickleball courts where tennis is still being played. The slab has to be sound first: lines are a coating, and a coating cannot hold a failing surface together.

What is the difference between resurfacing and rebuilding?

Resurfacing renews the coating on top of the slab; rebuilding replaces the slab itself. That distinction decides most tennis court spending, because resurfacing cannot fix a base that is moving. Where cracks are structural rather than surface, coating over them buys a season or two and the same money is spent again.

Tennis courts by location

CourtQuote covers six markets today. Each one lists the contractors we hold records for and what we have checked about them.

Tell us what you are planning

Start with the project type and location. You can add dimensions, surface condition, timeline and photos next. Browsing is free and takes no details.